  • 2013
    • First Electricity Revenue of Xuchang Received
    • The 2012 Electricity Subsidy for Qinghai Solar Farm Collected
    • Three Party Contract of Power Generation and Consumption of Xuchang Project Signed
    • Three Party Contracts of Power Generation and Consumption of Zhengzhou Project Signed
    • Grid Connection Scheme of Xuchang 20MW PV Project Accepted by the Grid
    • Disposed Entire Interest in Health Check Business
    • Beijing Junyang was Elected as the Deputy Chair of Jiangsu Renewable Energy Council
    • Golmud 10MW Solar Farm Was listed in the 4th List of Electricity Tariff Subsidy by the State Commission of Developent and Reform
    • Zhengzhou 1.525MW Solar Project Passed Safty Evaluation
  • 2012
    • Beijing Jianheng Certification Centre Conducted Field Inspection on Xuchang 20MW Solar Plant
    • The Initial Power Generation Certiicate for Zhengzhou 1.525MW Solar Project Issued
    • Disposed Entire Shares in Zhengzhou Gogreen Thin-Film Solar Module Plant
    • The Construction of Xuchang 20MW Completed
    • The Plan of Grid Connection of Zhengzhou 1.525MW Solar Project Was Approved
    • Zhengzhou 1.525MW Solar Project Passed Beijing Jianheng Certification Centre Test
    • Golmud 10MW Solar Farm Was Granted Power Generation Certificate
    • 70% of Subside to Xuchang 20MW Solar Project Arrived
  • 2011
    • The FiT of ¥1.15/kwh for Golmud 10MW Solar Farm Was Approved by the State Commission of Development and Reform
    • Golmud 10MW Solar Farm Grid Connected and Started Power Generation
    • Completion of the Construction of Golmud 10MW Solar Farm
    • The Commencement of Construction of Xuchang 20MW Solar Plant
    • The Grid Connection Plan for Golmud 10MW Solar Farm Approved
    • Xuchang Junyang Power Limited Registered
    • The First Subsidy to 1.525MW Solar Plant Arrived
    • The Commencement of Construction of Zhengzhou 1.525MW Solar Project
    • Xuchang 20MW Solar Project Approved by the Ministry of Finance
    • Golmud 10MW Solar Farm Project Approved by the State Commission of Development and Reform
  • 2010
    • Application of 20MW Rooftop Solar Plant by Henan Junyang Was Approved
    • Henan Junyang Power Limited Registered
    • The First Rooftop Solar plant of Junyang Commenced Operation
    • Commencement of Production of Zhengzhou 100MW Thin-Film Solar Module Production Line
    • Beijing Junyang Investments Limited Registered
    • The Company Renamed to China Gogreen Assets Investment Limited
    • Zhengzhou Gogreen Ordered the 100MW Thin-Film Solar Module Production Line
  • 2009
    • Joint Venture with Zhengzhou High-Tech Zone Administration
  • 2008
    • Qinghai GS Solar Limited Registered